My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-20_PERMIT FILE - C1982056A (8)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2011-06-20_PERMIT FILE - C1982056A (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:39 PM
Creation date
11/1/2011 2:51:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
6/20/2011
Doc Name
Pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the shaft. This will help assure that, after final closure, groundwater from this unit will be confined and not seep <br />down the inside of the shaft. <br />Upon completion of shaft drilling and steel liner installation for both shafts, the cuttings pit will be dewatered. <br />Excess water will be hauled to the Area 1 Pit, and the remainder will be allowed to evaporate. After dewatering the <br />cuttings pit and allowing the cuttings to consolidate and dry-out, the collection pit and cutting materials will be <br />covered with stockpiled materials from the shaft collar excavation, graded and revegetated with a temporary cover. <br />A sign(s) will be posted designating the temporary mine development waste pit. The cuttings and shaft collar <br />excavation materials will be utilized to re-fill the shafts during eventual reclamation of the shaft installation. <br />As shown on Map 23, additional entries will be driven from the 18-Left gate-road to the north to connect with the <br />two ventilation shafts. The entries will be driven in the same manner as is used in TCC's development work, i.e. <br />continuous miners and shuttle cars. <br />Following completion of shaft boring and casing operations and removal of the drilling equipment from the site, <br />emergency hoist equipment, consisting of an escape capsule, hoist derrick, hoist drive unit, control equipment and <br />18 x 24 foot pre-fabricated metal hoist house, and apre-fabricated propane-fired shaft heater and ducting will be <br />erected/installed on the previously constructed intake shaft concrete pad. The shaft heater will be connected to a <br />propane supply tank, mounted on prefabricated concrete saddles, and a buried electrical cable. Similarly, a fan <br />enclosure (fan shroud), silencer, and electrical control building will be erected on the previously constructed <br />exhaust shaft concrete pad, and the fan, fan drive motor, and electrical control, monitoring, and communication <br />systems will be installed. It is presently anticipated that the 400 hp, 90,000 cubic-foot per minute Robinson Fan <br />and associated equipment will be relocated to the 18-Left Ventilation Shaft from the EMD Ventilation Shaft <br />location. A chain-link security fence with a locked gate will be constructed to enclose the intake shaft and <br />emergency hoist installation. Following commissioning, the shaft pad site and access road will be cleaned-up and <br />surface areas graded and dressed. <br />TR09-66 2.05 - 45.61 04/07/09 <br />