2011-09-18_PERMIT FILE - C2009087A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087A
>
2011-09-18_PERMIT FILE - C2009087A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:13 PM
Creation date
11/1/2011 2:02:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
9/18/2011
Doc Name
Permit Area
Section_Exhibit Name
2.05.3 Operation Plan - Permit Area
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 - PERMITS <br />• Lube Storage — Includes Storage Tanks <br />• Bath House <br />• Fuel Tanks <br />• Substations — Internal substations are required facility area, main substation belongs to YVEA <br />• Pond 002 Pump Facility — facility to remain as permanent as required by the State Engineer's <br />Office <br />• Office <br />• Water Well <br />• Parking lots, fences, roads, and ancillary structures (including culverts) associated with the <br />previously mentioned features /structures <br />• A security building will be constructed at the boundary to the property. The security building <br />will be a 12 x 40 foot wood -frame structure on a 15 x 45 foot, 4 -inch thick concrete slab. <br />• A modular bathhouse 24 feet wide and 70 feet long will be placed between the shop and <br />existing bathhouse. The temporary building will be placed on 9 concrete sleepers poured on 8 <br />foot centers. Each sleeper will be 20 feet long, 2 feet wide and 1 foot deep. <br />• A pump house at the Wadge Pond will be constructed to pump water out of the pond to the 1 <br />million gallon water storage tank. The pump house will be 20 feet by 30 feet and be <br />constructed on a concrete slab of the same size 8 inches in thickness. <br />Mine facilities in the north end were previously bonded under the former Seneca II Mine. On <br />approval of the PSCM Permit, the performance bond for these facilities and the associated <br />disturbance areas were transferred to PSCM. A description of those features /structures and the <br />associated bond amounts are presented in Exhibit 2.05.3 -E1, Mine Facilities (North End) Details. <br />There will be additional facilities constructed or relocated to facilitate operations. These facilities <br />include: <br />Bath House /Septic System - A new bath house and septic system will be installed to accommodate <br />mine employees. In order to determine the type of septic system required test pits will need to be <br />excavated just west of the existing bath house /warehouse (see Figure 1). Two pits will be excavated <br />to a depth of approximately 8'. Soil profiles will be recorded and the pits will be immediately <br />backfilled and area reseeded. <br />Replacement Water Well - A new domestic water well will also be required to accommodate the <br />new bath house in addition to the office facilities. The new well will replace the existing well with a <br />new pump and chlorination system. PSCM proposes to drill a test hole (755'x 5 5/8 ") approximately <br />100' west of the existing well to check for a viable source of water. If a viable source is not found <br />the hole will be backfilled and another nearby location will be drilled. <br />Replacement Power Poles and Installation of Fiber Optics Line - There is an existing 4,160 kV <br />line running from the YVEA substation to the Sage Creek Office facilities. The condition of the <br />poles and associated power infrastructure is poor and currently unable to accommodate needed fiber - <br />optic lines. PSMC will replace the poles and line and move them slightly east and away from their <br />current location along Little Grassy Creek. The line would instead run along the haul road. The <br />existing poles will be removed. <br />MR -05 2.05 -11 Revision 08/11 <br />