Laserfiche WebLink
Rehabilitation Costs for Creek Cleanup <br />Includes only reclamation costs. Preparatory mining = $32,287.22 additional <br />Excavating Drop Cut - <br />Cost of Loader <br />Komatsu WA600 <br />Loader Operator Cost <br />Two Trucks and Drivers <br />Cost of trucks <br />Driver Costs <br />$8,400.00 <br />$2,481.60 <br />Dozer Cost $1,350.00 <br />Operator Cost $310.20 <br />Foreman Cost $1,380.40 <br />Total $18,996.60 <br />Creek Channel Cleanup 12 hours <br />Backhoe 225 <br />Backhoe Cost <br />Operator Cost <br />Backhoe 345 <br />Backhoe Cost <br />Operator Cost <br />Two Laborers for hand cleanup <br />Laborer Cost <br />Foreman Cost <br />Remove Ramp and Make Bench - 4 - 10 hour days <br />Backhoe 345 <br />Backhoe Cost <br />Operator Cost <br />Two Haul Trucks <br />Truck Cost <br />Operator Cost <br />4 - 10 hour days to complete <br />$4,000 <br />$1,074.40 <br />Total <br />$960.00 <br />$372.24 <br />$1,320.00 <br />$372.24 <br />$556.08 <br />$414.12 <br />$3,994.68 <br />$4,400.00 <br />$1,240.80 <br />$8,400.00 <br />$2,481.60 <br />Foreman Cost $1,380.40 <br />Total $17,902.80 <br />Total Project Cost $40,894.08 <br />