My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-29_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
2003-07-29_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:15:44 PM
Creation date
11/1/2011 7:30:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
7/29/2003
Doc Name
Robinson Dam
From
DWR
To
Climax
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 h <br />DAM NAME: ROBINSON <br />W <br />U OC <br />Z Q <br />o• <br />Z <br />W cc <br />Z <br />aQ <br />2 <br />rn <br />0 <br />0 <br />0 0 <br />00 <br />EXISTING INSTRUMENTATION FOUND E (110) NONE 0(111) GAGE ROD ❑ (112) PIEZOMETERS (113) SEEPAGE WEIRS / FLUMES <br />MONITORING OF INSTRUMENTATION 0 (116) NO Q (117) YES PERIODIC INSPECTIONS BY: <br />Monuments need to be resurveyed and report submitted to our office. <br />PROBLEMS NOTED: f (60 NONE fl (61) ACCESS ROAD NEEDS MAINTENANCE E (62) CATTLE DAMAGE <br />0(63) BRUSH ON UPSTREAM SLOPE. CREST, DOWNSTREAM SLOPE, TOE 0(64) TREES ON UPSTREAM SLOPE, CREST, DOWNSTREAM SLOPE, TOE <br />6 <br />r y <br />r V OI r <br />o• D. 'E <br />N • . . 4 0 <br />O 1- <br />•10 4 •C 7 <br />C.12 ° <br />.3 'o 3 E <br />C d 2 ' N 2 <br />o . 4 <br />• 4 0 cr <br />nrr E :� <br />C ` <br />a o C <br />ai c <br />q n r 0 <br />NvN$? <br />E g Eao <br />N <br />t N N a Li <br />01 C 4 4 <br />C G C <br />o g r y <br />O o a N E <br />ay w <br />r r <br />• O N <br />< c o Y N <br />c n om: ° . <br />W N E D W <br />✓ d <br />o- C S o <br />0) E O N u <br />✓ N n 0 r <br />1-q 20 <br />Engineer's <br />Signature <br />(114) SURVEY MONUMENTS ❑ (115) OTHER <br />(65) RODENT ACTIVITY ON UPSTREAM SLOPE, CREST. DOWNSTREAM SLOPE Q fl (66) DETERIORATED CONCRETE - FACING, OUTLET SPILLWAY <br />fl (67) GATE AND OPERATING MECHANISM NEED MAINTENANCE 0 (68) OTHER <br />Usual rodent activity in area at the toe of the downstream slope between the spillway and maximum <br />section of dam. See page 3. <br />Dam is in satisfactory condition, but unknown condition of old outlet, with its intake buried in silt, has been <br />neglected for many years warrants conditionally satisfactory rating. Also condition of siphon is unknown. <br />Based on this Safety Inspection and recent file review, the overall condition is determined to be: <br />0 (71) SATISFACTORY n (72) CONDITIONALLY SATISFACTORY <br />MAINTENANCE • MINOR REPAIR • MONITORING <br />0 (80) PROVIDE ADDITIONAL RIPRAP: <br />0(81) LUBRICATE AND OPERATE OUTLET GATES THROUGH FULL CYCLE <br />0(82) CLEAR TREES AND /OR BRUSH FROM: <br />(84) GRADE CREST TO A UNIFORM ELEVATION WITH DRAINAGE TO THE UPSTREAM SLOPE: Add more road base to make it easier to maintain <br />r� <br />I0� (85) PROVIDE SURFACE DRAINAGE FOR: <br />0 (86) MONITOR: <br />(87) DEVELOP AND SUBMIT AN EMERGENCY PREPAREDNESS PLAN: Update plan as changes occur <br />(88) OTHER <br />R(89) OTHER <br />ENGINEERING • EMPLOY AN ENGINEER EXPERIENCED IN DESIGN AND CONSTRUCTION OF DAMS T0: (Plans and Specifications must be approved by State Engineer prior to construction.) <br />El (90) PREPARE PLANS AND SPECIFICATIONS FOR REHABILITATION OF THE DAM: <br />0(91) PREPARE AS -BUILT DRAWINGS OF: <br />❑ (92) PERFORM A GEOTECHNICAL INVESTIGATION TO EVALUATE THE STABILITY OF THE DAM: <br />0 (93) PERFORM A HYDROLOGIC STUDY TO DETERMINE REQUIRED SPILLWAY SIZE: <br />0(94) PREPARE PLANS AND SPECIFICATIONS FOR AN ADEQUATE SPILLWAY: <br />0 (95) SET UP A MONITORING SYSTEM INCLUDING WORK SHEETS, REDUCED DATA AND GRAPHED RESULTS: <br />(96) PERFORM AN INTERNAL INSPECTION OF THE OUTLET: Both old pipe & siphon. Keep us aprised of Inspection & submit report <br />(97) OTHER: For outlet inspection, construct cofferdam as planned under direction of engineer. <br />(98) OTHER: The submittal of plans and specs for item (97) are not required <br />� (99) OTHER: <br />[1 (101) FULL STORAGE <br />FT. BELOW DAM CREST <br />cu (102) CONDITIONAL FULL STORAGE FT. BELOW SPILLWAY CREST <br />(103) RECOMMENDED RESTRICTION FT. GAGE HEIGHT <br />0(104) CONTINUE EXISTING RESTRICTION NO STORAGE MAINTAIN OUTLET FULLY OPEN <br />REASON FOR RESTRICTION <br />(83) INITIATE RODENT CONTROL PROGRAM AND PROPERLY BACKFILL EXISTING HOLES: downstream slope & toe <br />remove oldpipeline from dam crest near the spillway to make crest regrading easier. <br />Uncover outlet Intake <br />Page 2 <br />ITEMS REQUIRING ACTION BY OWNER <br />TO IMPROVE THE SAFETY OF THE DAM <br />SAFE STORAGE LEVEL RECOMMENDED AS A RESULT OF THIS INSPECTION <br />ACTIONS REQUIRED FOR CONDITIONAL FULL STORAGE O^ ^ ^ "*"-^ ^'^" ^ "C'^'(;TM ^' ^'^ <br />Items (97) and (961 <br />J <br />DAM I.D.: 370107 DATE. 7/17/2003 <br />(118) OWNER R,/ (119 ENGINEER <br />0 (73) UNSATISFACTORY <br />Owner's <br />Signature <br />INSP CTED BY OWNER/OWNERS REPRESENTATIVE <br />DATE: <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />/ <br />pp 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.