My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-29_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
2003-07-29_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:15:44 PM
Creation date
11/1/2011 7:30:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
7/29/2003
Doc Name
Robinson Dam
From
DWR
To
Climax
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF WATER RESOURCES <br />WATER DIVISION 5 <br />Office of the State Engineer <br />Department of Natural Resources <br />P O Box 396 (50633 U S Highway 6 s 24) <br />Glenwood Springs CO 81602 <br />Phone (970) 945 -5665 <br />FAX (970) 945 -8741 (call first) <br />TAVIS ROGERS <br />�o CLIMAX MOLYBDENUM COMPANY <br />HIGHWAY 9 — FREEMONT PASS <br />CLIMAX, CO. 80429 <br />Dear Tavis: <br />Enclosed is a copy of my report for the inspection of the Robinson Dam conducted on July 17, <br />2003. Please note and implement the recommendations on Page 2 of the inspection report. Also, <br />please sign, date, and return the extra copy of page 2 of the inspection report to the post office <br />address at the top of this letter. <br />Overall the dam was found to be in satisfactory condition. However, the unknown condition <br />of <br />the outlet with its intake buried in silt is a concern and warrants a conditionally satisfactory I am glad to hear that you are moving forward with draining the reservoir, constructing <br />a cofferdam, uncovering the outlet intake, and performing an internal inspection. All this needs <br />to be performed under the direction of your engineer and our office kept apprised of the <br />activities. A final report of the internal inspection and other pertinent activities needs to be <br />submitted to our office. <br />If you have any questions regarding this report, please contact me. At (970) 945 <br />Sincerely, <br />Yohn Blair, P.E. <br />Division 5 Dam Safety Engineer <br />cc: Alan Martellaro, Division Engineer <br />Doug Boyer, chief, Dam Safety Branch <br />Bill McEwen, Water Commissioner <br />July 29, 2003 <br />STAIE OF cOLORADO <br />RE: ROBINSON <br />W. Div. 5, DAMID: 370107 <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Hal D. Simpson <br />State Engineer <br />Alan C. Martellaro <br />Division Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.