Laserfiche WebLink
Executive Summary <br />Table of Contents <br />vi <br />viii <br />Glossary <br />1. Introduction 1 <br />Background of Previous PMP Studies 1 <br />Site - Specific PMP Studies 2 <br />Objectives 3 <br />Approach 3 <br />Basin Location and Description 3 <br />2. Topographic Effects on Available Moisture 8 <br />Barrier Moisture Depletion 8 <br />Determining Moisture Inflow Wind Direction 8 <br />Use of a GIS to Analyze Moisture Barrier Elevations 8 <br />Determination of Effective Barrier Heights 17 <br />3. Meteorological and Orographic Factors 24 <br />4. Significant Storm Events 25 <br />Approach 25 <br />Storm Search Results 27 <br />5. Storm Adjustment Procedures 32 <br />5.1 Maximization Introduction 32 <br />5.2 Use of Dew Point Temperatures in Maximization 32 <br />5.3 Storm Transpositioning 33 <br />5.4 Use of Maximum Dew Points in Transpositioning 33 <br />5.5 Barrier and Storm Elevation Adjustments 34 <br />6. Storm Analysis 34 <br />6.1 Approach 34 <br />6.2 Storm Discussions 34 <br />6.2.1 Bug Point, Utah 35 <br />6.2.2 South of Silverton, Colorado 36 <br />6.2.3 Grand Mesa, Colorado 37 <br />6.2.4 Gladstone, Colorado 38 <br />6.2.5 Dinosaur National Monument, Colorado 39 <br />6.2.6 North Ogden, Utah 40 <br />6.2.7 Opal, Wyoming 41 <br />6.2.8 Morgan, Utah 42 <br />6.2.9 Muddy Creek, Colorado 43 <br />6.2.10 Mesa Verde National Park, Colorado 44 <br />3 <br />