Laserfiche WebLink
CLIMAX MINE FINANCIAL WART*RECLAMATION COST ESTIMATE <br /> Izl l <br /> 4.8 POND SHOP AREA -� <br /> PLAN SURFACE DISTURBANCE (ACRES) = N/A <br /> u <br /> c � <br /> d <br /> TASKS: <br /> Grade Pond Shop.Area. <br /> Haul and place topsoil at Pond Shop Area. <br /> l7 i <br /> Grade rl._I I Haul/Spread Topsoil ' j TOTAL COSTS <br /> Area A9 <br /> Equipment ! D7H 773B 988B D7H Q \ <br /> i <br /> Dozer I Haul Truck Loader Dozer I l" <br /> Time Required(hours) �' 8.52 3.82 1.27 1.27 ------ <br /> Area Reclaimed(acres) -----;� <br /> i <br /> I <br /> I <br /> I <br /> Unit Cost I <br /> Equipment($/hour) j $7262 $11415' $90'43 $72 62' ------ <br /> Labor($/hour) : ` ..$23 12 �$22 76s $22 22 $23 i2 ------ <br /> _ w - <br /> Other Cost ----- ------ - - - ------ ------ <br /> S12) <br /> ubtotal Equipment Cost +i $618.72 I $436.05 $114.85 $92.23 $1,261.85 <br /> Subtotal Labor Cost $196.98�� $86.94 $28.22 $29.36 $341.51 <br /> Subtotal Other Cost I -----I ------ ------ ----- <br /> - $0.00 <br /> � $1,603.36 <br /> TOTAL TASK COST j $816 $523 $143 $122 <br /> TOTAL TASK COST-MULTIPLE EQUIPMENT " $788 <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 66 <br />