Laserfiche WebLink
2/5/99 <br />46 CLIMAX MINE FINANCIAL WARRA , RECLAMATION COST ESTIMATE <br />6.0 OTHER RECLAMATION AND CLOSURE COSTS <br />6.1 Seal Underground Mine Openings <br />Storke Portal - 12'x14' <br />No. 5 Shaft - 234" Diameter <br />No. 7 Shaft - 28' Diameter <br />No. 3 Gallery - 8' x 8' <br />TOTAL <br />Subtotal <br />$5,880.00 <br />$21,400.00 <br />$30,750.00 <br />$2,240.00 <br />$60,270.00 Le" <br />6.2 Revegetation & Reseeding <br />TASK <br />9 Revegetation of new Ark. R. Channel <br />101 Hydroseed slopes steeper than 3:1 (w/ 50% failure) <br />102 Drill seed slopes flatter than 3:1 <br />103 50% failure rate of drill seed slopes <br />100 See Financial Warranty Transmittal Letter Dated February 8, 1999. <br />TOTAL <br />TOTAL ($) <br />$10,680.85 <br />$1,909,358.23 <br />$1,296,586.44 <br />$585,819.30 <br />$3,802,444.82 <br />6.3 Haul Equipment Requiring Assembly/Disassembly <br />TOTAL <br />Golder Associates Inc. <br />FRED R. BANTA, INC. <br />983-2460 <br />90 <br />