CLIMAX MINE FINANCIAL WARWCLAMATION COST ESTIMATE <br /> 5.2 TASK 5 -DEMOLITION <br /> Lrsiutcd Llim <br /> Bldg lt Facility Designation Dimensions Material Volume/Size Unit Costs Estimated/ <br /> W Actual Cost <br /> 101 49 CONVEYOR -conveyor on grade 1501 X ITW X ITH STEEL 150 LINXT. 27 $ 4,050 <br /> 101 53 CONVEYOR -conveyor on grade 170'L X ITW X ITH STEEL 170 LIN.FT. 27 $ 4,590 <br /> 101 J55 CONVEYOR -conveyor elevated 1601 X 12'W X ITH STEEL 160 LINXT. 33.75 $ 5,400 <br /> 101 56 CONVEYOR -conveyor on grade 120'L X ITW X ITH STEEL 120 LINYT. 27 $ <br /> 101 " " -asbestos removal NA ASBESTOS 1 ESTIMATE L.S. $ <br /> 101 V 57 CONVEYOR -conveyor on grade 40'L X 12'W X ITH STEEL 40 LINYT. 27 $ 1,080 <br /> 101 58 CONVEYOR -conveyor elevated 6301 X ITW X ITW STEEL 630 LINXT. 33.75 $ 21,263 <br /> 101 V 59 CONVEYOR -conveyor elevated 3701 X 12'W X ITH STEEL 370 LIN.FT. 33.75 $ 12,488 <br /> 101 V 60 CONVEYOR -conveyor elevated 3501 X ITW X ITH STEEL 350 LINXT. 33.75 $ 11,813 <br /> 101 61 CONVEYOR -conveyor elevated 420'L X 15'W X 15'H STEEL 420 LINYT. 33.75 $ 14,175 <br /> 101 353 CONVEYOR-conveyor elevated 5001 X 15'W X 15'W STEEL 500 LINXT. 52.69 $ 26,345 <br /> 101 67A CONVEYOR-conveyor elevated 1050'L X 12'W X ITH STEEL 1050 LINYT. 33.75 $ 35,438 <br /> 101 7B CONVEYOR-conveyor elevated 10501 X ITW X ITH STEEL 14,LFT. 33.75 $ 35,438 <br /> MILL UTILITY TRESTLE-elevated 450'L X 12'W X ITH STEEL 4N LINXT. 33.75_ $ 15,188 <br /> CONVEYOR FOUNDATION-assume 4079'L X TW X 37 CONCRETE 24474 cu ft 0.37 9,055 <br /> 0.51.ft.footing-for each I.ft.conveyor <br /> Climax's Estimated Conveyor Rem val Total $ 287,056 <br /> Notes: Climax Method accepts the DMG's figures for demolition on grade,and for elevated conveyors uses a figure of 25%additional/cost(verified by Steve Thomas of Wayne <br /> Gomez Demolition and Excavating, 11-11-97)for shearing the supports to get conveyor on the ground. For instance,DMG's cost estimate for an 18 x 18 conveyor on grade is$60.75 <br /> per foot. The Climax method accepts this number and adds 25%due to the fact that the conveyor is elevated. The resultant cost per oot is$60.75 x 1.25=$75.94. Similar <br /> calculations have been made for the other conveyor sizes. The figure for concrete demolition comes from experience at Horizon and limax Storke Areas,where the old explosive <br /> sheds(2 ft thick steel and re-bar)were demolished at a cost of$0.37/cu ft. Climax accepts DMG's estimate for asbestos removal. Ccff)V'K <br /> Bone Yard Demolition <br /> OP PIT FIRE PLGS SHP-misc.non-haz.debris 20'L X 20'W X 5'H COMBINATION 2000 CU.FT. 0.13 $ 260 <br /> OP PIT FIRE PLGS SHP-misc.non-haz.debris' 20'L X 20'W X 5'H COMBINATION 2000 CU.FT. 0.13 $ 260 <br /> tl'qP PIT FIRE PLGS WSH-misc.non-haz.debris 20'L X 20'W X 5'H COMBINATION 2000 CU.FT. 0.13 $ 260 <br /> OP PIT FIRE PLGS WSH-misc.non-haz.debris 20'L X 20'W X 5'H COMBINATION 2000 CU.FT. 0.13 $ 260 <br /> OPEN PIT DOCKS -misc.non-haz.debris 2201 X 10'W X 5'H COMBINATION 11000 CU.FT. 0.13 $ 1,430 <br /> i/IRECO PLNT FOUNDTN 1-misc.non-haz.debris 351 X 35'W X 5'H COMBINATION 6125 CURT. 0.13 $ 796 <br /> RECO PLNT FOUNDTN 2-misc.non-haz.debris 251 X 20'W X 5'H COMBINATION 2500 CU.FT. 0.13 $ 325 <br /> IRECO PLNT FOUNDTN 3-misc.non-haz.debris 25'L X 20'W X 5'H COMBINATION 2500 CURT. 0.13 $ 325 <br /> IRECO PLNT FOUNDTN 4-misc.non-haz.debris 251 X 40'W X 5'H COMBINATION I 5000 CURT. 0.13 $ 650 <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R BANTA,INC. 87 <br />