CLIMAX MINE FINANCIAL WARRANTY RECLAMATION COST ESTIMATE
<br /> 5.2 TASK 5 -DEMOLITION
<br /> Projectedlimax
<br /> Bldg# Facility Designation Dimensions Makri&l Volume/Size Unit Costs Estimated/
<br /> Actual Cost
<br /> s 1 Climax Autocad Measured
<br /> Asphalt Road and Lot Demolition Disposition Area,yds!
<br /> �M f�
<br /> ✓OLD HIGHWAY -demolish asphalt rip and haul ASPHALT r 3 310-) 84,462 sq yds, 2.50 $ 211,155
<br /> ✓ THORPE AVENUE -demolish asphalt rip and haul ASPHALT ZIP(Q,�(7 7,074 sq yds, 2.50 $ 17,685
<br /> ✓I/R BACK PARKING LOT-demolish asphalt burial in-place ASPHALT i 11O 9,500 sq yds, n/c $ -
<br /> �/ GEOL BLDG BACK PK LT-demolish asphalt rip and haul ASPHALT 1ncl above 0.00 $ -
<br /> ✓ SCHOTT BOULEVARD -demolish asphalt burial in-place ASPHALT ("; 4q;b) .3,036 sq yds, / n/c )$ -
<br /> CONNECTING ROAD I -demolish asphalt rip and haul ASPHALT ( o]) 2,752 sq yds, '2'S0` $ 6,880
<br /> ✓SECOND STREET -demolish asphalt burial in-place ASPHALT (Sscf 6) 1,756 sq yds, n/c $ -
<br /> r/ CONTRACTORS ENTRANCE-demolish asphalt rip and haul ASPHALT (j,(p36 ncl T1)H Park 0.00 '$ -
<br /> ✓GATE PARKING -demolish asphalt rip and haul ASPHALT (jp D7o) 5,168 sq yds, 2.50 $ 12,920
<br /> ✓ CONNECTING ROAD 2 -demolish asphalt rip and haul ASPHALT I'Z,4jO 1,874 sq yds, 2.50 $ 4,685
<br /> FIFTH STREET -demolish asphalt burial in-place ASPHALT -0 1 2,046 sq yds, �n/c. $ -
<br /> ✓TDH PARKING -demolish asphalt rip and haul ASPHALT 7,063 sq yds, 2:50 $ 17,658
<br /> CO.BLVD -demolish asphalt burial in-place ASPHALT 37,/(,o')127,525 sq yds, (` n/c $v11TRANSPORTATION LOT -demolish asphalt rip and haul ASPHALT (3 330 ' 3,573 sq yds, '2�50- 8,933
<br /> ACCESS TO 2 CRUSHER-demolish asphalt rip and haul ASPHALT 0�' 4,155 sq yds, 2.50 $ 10,388
<br /> NO 2 CRUSHER LOT -demolish asphalt rip and haul ASPHALT bilq0 'incl above 0.00 $ -
<br /> CONNECTING ROAD 3 -demolish asphalt rip and haul ASPHALT 7- &YQ 2,023 sq yds, 2.50 $ 5,058
<br /> HOTEL BOULEVARD -demolish asphalt rip and haul ASPHALT (,dpncl CO.Blvd 0.00 $ -
<br /> v"NO 6 CRUSHER ROAD -demolish asphalt rip and haul ASPHALT ���b 11,807 sq yds, 2.50 $ 29,518
<br /> V NO 6 CRUSHER PARKING-demolish asphalt rip and haul ASPHALT (R 7zo'1`incl above 0.00 $ -
<br /> t/SURF MAINT RD -demolish asphalt rip and haul ASPHALT (p 4p b) 2,794 sq yds, 2.50 $ 6,985
<br /> SURF MAINT LOT -demolish asphalt rip and haul ASPHALT incl above 0.00 $ -
<br /> INFIRMARY LOT -demolish asphalt rip and haul ASPHALT p,60)incl CO.Blvd 0.00 $ -
<br /> ✓OXIDE MILL LOT -demolish asphalt reclaime_d'91 ASPHALT 1, uried/Reclmd n/e $ -
<br /> ✓GO LOT -demolish asphalt rip and hauls ASPHALT j' S�O incl CO.Blvd 0.00 $ -
<br /> V CHASE ONE SHOP LOT -demolish asphalt rip and haul ASPHALT (j,'00)incl CO.Blvd 0.00 $ -
<br /> MAYFLOWER WWTP PK LT-demolish asphalt burial in-place ASPHALT ( gp�"`1 _ 259 -�q yd"s; n/c $ -
<br /> OLD HIGHWAY -demolish asphalt rip and haul old hwy abv \ _"0r00 $ -
<br /> Golder Associates Inc. ___.- 983-2460
<br /> 2/5/99 FRED R.BANTA,INC. 85
<br />
|