My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-05_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
1999-02-05_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 4:27:50 PM
Creation date
11/1/2011 7:29:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
2/5/1999
Doc Name
Water Treatment Facility Area
From
Climax
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIMAX MINE FINANCIAL WARRAECLAMATION COST ESTIMATE <br /> 5.1 TASK 4 - DEMOLITION <br /> Projected Climax <br /> Unit Costs Estimated/ <br /> Bldg.# Facility Designation Dimensions Material Volume/Size Actual Cost <br /> 47 COVERED STORAGE -SUPERSTRUCTURE 601 X 25'W X 14'H TIN 21000 CU.FT. 0.13 $ 2,730 <br /> " -FLOOR(8"T plain) 601 X 25'W CONCRETE 1500 SQ.FT. <br /> -FOOTING(1.57 X 2.0'W) 60'+60'+25'+25' CONCRETE 170 LIN.FT. <br /> 48 2 CR DUST COLLECTOR-SUPERSTRUCTURE 74'L X 36'W X 30'H STEEL 79920 CU.FT. 0.13 $ 10,390 <br /> " -FLOOR(10"T w/rebar) 741 X 36'W CONCRETE 2664 SQ.FT. <br /> " -FOOTING(1.57 X 2.0'W) 74'+74'+36'+36' CONCRETE 220 LIN.ET. <br /> ASBESTOS REMOVAL NA ASBESTOS (1 ESTIMATI <br /> "9 SCALE HOUSE -SUPERSTRUCTURE 801 X 16'W X 16'H STEEL 20480 CU.FT. 0.13 $ 2,662 <br /> -FLOOR(10"T plain) 801 X 16'W CONCRETE 1280 SQ.FT. <br /> " -FOOTING(1.57 X 2.0'W) 80'+80'+16'+16' CONCRETE 192 LIN.FT. <br /> 50 P2S5 BUILDING -SUPERSTRUCTURE 65'L X 35'W X 16'H STEEL 36400 CU.FT. 0.13 $ 4,732 <br /> " -FLOOR(8"T w/rebar) 65'L X 35'W CONCRETE 2275 SQ.FT. <br /> -FOOTING(1.57 X 2.0'W) 65'+65'+35'+35' CONCRETE 200 LIN.FT. <br /> �51 45 DRIVE BUILDING -SUPERSTRUCTURE 11OIL X 52'W X 40'H STEEL 228800 CU.FT. 0.13 $ 29,744 <br /> " -FLOOR(12"T w/rebar) 11OIL X 52'W X 40'H CONCRETE 5720 SQ.FT. <br /> -FOOTING(2.07 X 3.0'W) 110'+110'+52'+52' CONCRETE 324 LIN.FT. <br /> 52 20 K BIN -SUPERSTRUCTURE 220'L X 11TW X 40'H STEEL 1029600 CU.FT. 0.13 $ 133,848 <br /> FLOOR(12"T w/rebar) 2201 X 11TW CONCRETE 25740 SQ.FT. <br /> FOOTING(2.07 X 3.0'W) 220'+220'+117'+117' CONCRETE 674 LINY <br /> " " " -ASBESTOS REMOVAL NA ASBESTOS �'" 1 ESTIMAT <br /> f <br /> f <br /> V53 29A/30 TRANS TOWER-SUPERSTRUCTURE 26'L X 26'W X 40'H STEEL 27040 CU.FT. 0.13 $ 3,515 <br /> -FLOOR(8"T w/rebar) 26'L X 26'W CONCRETE 676 SQ.FT. <br /> " -FOOTING(1.5'T X 2.0'W) 26'+26'+26'+26' CONCRETE 104 LIN.FT. <br /> " -ASBESTOS REMOVAL NA ASBESTOS 1 ESTIMATE jlyIG <br /> 54 NO 28 ROTOCLONE -SUPERSTRUCTURE ITL X 41'W X 16'H STEEL 1 152 CU.FT. 0.13 $ 1,450 <br /> " -FLOOR(8"T w/rebar) 1TL X 41'W CONCRETE 697 SQ.FT. <br /> " -FOOTING(1.57 X 2.0'W) 17'+17'+41'+41' CONCRETE 116 LIN.FT. <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.