Laserfiche WebLink
v <br /> �7 10 <br /> 7- <br /> Continuation of monit�in y <br /> �itiated in Jul 2000 described as follows: monthly monitoring of 5-shaft water <br /> for PCB for a period of 12-months and quarterly monitoring of the Arkansas Monitoring Well for PCB for a <br /> period of 6 calendar quarters. If both the 5-shaft and Arkansas Monitoring Well show non-detect results for <br /> PCBs during this period, Climax and the Division of Minerals and Geology will conclude that the PCB <br /> monitoring requirement may be eliminated from the Climax Mine Reclamation Permit. Results of the <br /> analyses required under the corrective action plan will be submitted to the Division in September 2001 <br /> unless PCBs are detected at either of the sampling locations. Detection of PCB will be reported by Climax <br /> to the Division within five working days of the time that Climax learns of PBC detection in the analytical <br /> results. <br />