My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-04-01_GENERAL DOCUMENTS - M1977493
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
2005-04-01_GENERAL DOCUMENTS - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:11 PM
Creation date
11/1/2011 7:29:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
4/1/2005
Doc Name
Climax Mine Update
From
Climax
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fudge Management - Major Program Elements <br />Density Stage t water treatment sludge <br />Redistribution of Sludge from Mayflower to constructed cells <br />on Tentage <br />Implementation of two stage treatment for f, 3, 5 dam seep <br />flows (currently receive single stage treatment) <br />Upgrade process control and automation of overall water <br />management system <br />Treatment technology is not changing- Climax will continue to <br />use lime and settle <br />ydrowlde Water Treatment Sludge Balance <br />Historic allocation <br />• 7OxO%removed by Mayflower Pond <br />• <br />20,30% removed by TenmlM Pond <br />Target allocation with system upgrades <br />• 80%calUnned In cash constructed on Tenmile Dam <br />• 20%collecled In Mayflower pond <br />Goal- Assure continued compliance with NPDES limitations <br />with upgrades <br />Sludge Management - Schedule <br />• Extensive testing and evaluation over past four years to <br />identify preferred approach <br />• Feasibility level engineering of project is complete <br />• Appropriations approval by Mid May, 2005 <br />• 3'v and ar^ D, 2005- pipeline, sludge Cells, foundation, and <br />Lime Station upgrades and construction <br />• 2006- Remaining pipelines, pump stations, sludge <br />densigcation plant and process control upgrades and <br />construction <br />System will handle flows In excess of 50,000 gallons per <br />minute and maintain compliance <br />Sludge loading will be removed from Mayflower Pond <br />All major sources will receive two -stage treatment <br />Continue to use existing infrastructure that has proved <br />successful over the past 20 years. <br />u earrlaxMMyGderwrn <br />
The URL can be used to link to this page
Your browser does not support the video tag.