• <br />• <br />• Reclamation of the Crystal Hill Mine in Saguache County, Colorado involved the <br />structural demolition of the maintenance shop, the Merrill Crowe processing plant, <br />the security trailer, a storage yard, and a small lime storage building. Kaess <br />Contracting of Salida performed the demolition and reclamation work, and EEE has <br />access to the old invoices and bid sheets for costing information. <br />• Reclamation and decommissioning of the Horizon Mine in Eddy County, New <br />Mexico involved the structural demolition of over 50 buildings. The demolition <br />effort included asbestos removal and offsite disposal; removal of siding and roofing; <br />shear - cutting and torch - cutting steel structural members; rubblizing pier foundations <br />and concrete walls; breaking up and onsite disposal of concrete slabs; filling <br />basements with rubble and debris; covering "mounded" rubble piles with clean fill; <br />and revegetation. A complete set of invoices for all contractor work resides in the files <br />at EEE's office in Golden. The demolition was performed during January through <br />August, 1997, and is therefore very current. The general contractor was Spray <br />Systems Environmental of Tempe, Arizona and the demolition subcontractor was <br />Wayne Gomez Demolition and Excavating of Denver. <br />Additional background information includes the following contacts: (1) Steve Thomas of <br />Wayne Gomez Demolition and Excavating was contacted with respect to conveyor <br />demolition costs (phone conversation 11- 11 -97); (2) Kyle Ellis of Alternative Recycling <br />was contacted regarding cribbing demolition and removal costs (phone conversation 11- <br />13-97); (3) Jeff Mueller at Cyprus Amax's Ayrshire Mine was contacted regarding <br />conveyor demolition costs and salvage values (phone conversation 11- 11 -97); (4) Bryce <br />Romig has spoken with a representative of ASI -RCC (phone conversation with Frank <br />Kern on 11- 20 -97), the company responsible for demolition of the Storke Dry parking lot, <br />with regard to costs for ripping up and hauling off a large expanse of asphalt; and (5) <br />Mike Ellis has talked with Allen Sorenson (phone conversation, 10- 23 -97) regarding the <br />"Means site location adjustment factor" in DMG's spreadsheets. <br />