Laserfiche WebLink
• TABLE OF CONTENTS <br />1.0 INTRODUCTION AND BACKGROUND 1 <br />2.0 APPROACH AND RATIONALE 3 <br />2.1 DMG'S FIRST WORKBOOK M493 -4. WKB 3 <br />2.2 DMG'S SECOND WORKBOOK M- 493 -5.WKB 4 <br />3.0 RESULTS AND DISCUSSION 5 <br />3.1 ANALYSIS OF THE FIRST REVISED WORKBOOK 5 <br />3.2 ANALYSIS OF THE SECOND REVISED WORKBOOK 5 <br />4.0 SUMMARY 8 <br />• <br />5.0 REFERENCES 9 <br />• <br />List of Tables <br />Table 1. Table of Cost Comparisons Using DMG's Estimating Method Versus Actual <br />Mine Demolition Costs: Excel Workbook file "demo- costs- 10- 6 -97," 14 pages. <br />Table 2. Comparison of DMG's and Climax's Structural Demolition Cost Estimates: <br />Excel Workbook file "demo- costs - M493- 5- 11- 11 -97," 10 pages. <br />List of Appendices <br />Appendix A: Contractor Demolition Bids for Climax Mine, 1994 (6 pages) <br />Appendix B: Crystal Hill Mine Demolition Volumes and Costs (Actual) <br />Appendix C: Horizon Mine Demolition Volumes and Costs (Actual) <br />