My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-07-19_GENERAL DOCUMENTS - M1977493 (2)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
2001-07-19_GENERAL DOCUMENTS - M1977493 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2021 5:02:12 PM
Creation date
11/1/2011 7:29:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/19/2001
Doc Name
Submittal for Storke Water Return System
From
Climax
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ __ - _ ..� =}•sir /// <br /> Y <br /> 1YI 77—q(.3 <br /> CLIMAY MOLYBDENUM COMPANY climax Mine <br /> © A Subsidiary of Phelps Dodge Mining Company Hwy. 91 <br /> Climax, Colorado 80429 <br /> (719)486-2150 <br /> Fax(719)486-2251 <br /> July 17,2001 <br /> RECEIVED <br /> Via Certified Mail#7099 3220 0608 7294 3074 J[JL 19 2001 <br /> Allen Sorenson //,,,401ivision of Minerals and Geology <br /> Division of Minerals and Geology �� <br /> 1313 Sherman St.Rm.215 <br /> Denver,Co 80203 <br /> Regarding: Submittal for Storke Water Return System <br /> Dear Mr. Sorenson; <br /> Please find enclosed a plan for a water return pipeline on the Climax Mine Site. The plan calls for the <br /> construction of a new pipeline beginning at the Storke Complex and following an old railroad grade to its <br /> termination into an existing drainage box. The purpose for construction of the pipeline is to transport <br /> underground water from the Storke area to our water treatment facility. Currently this water is being <br /> transported by an antiquated infrastructure that has been in place for nearly 50 years. Our anticipated <br /> construction is scheduled for August of 2001;however,this date could possibly be pushed back until the <br /> summer season of 2002. <br /> Please feel free to call me if you would like to further discuss this matter. I can be reached at(719)486- <br /> 2150 Ext. 755 <br /> Sincerely, <br /> Lisa Berry <br /> Climax Molybdenum Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.