Laserfiche WebLink
idarch 22, 2010 <br />Hand Delivered <br />Climax Molybdenum <br />A Freeport - McMoRan Company <br />Mr. Allen Sorenson <br />Nitivision of Reclamation Mining and Safety <br />1313 Sherman St., Rm. 215 <br />Denver, CO 80203 <br />Re: Permit M- 1977 -493, Transmittal of 2009 Completion Maps for Robinson Lake Reclaim Pipeline and <br />Tailing Delivery Line <br />Dear Mr. Sorenson: <br />Per the request made during your October 21, 2009 visit to the Climax Mine, attached are two figures showing the <br />installation status of the above referenced pipelines as of the date of your inspection. The two figures show <br />current completed installation for the Robinson Lake Reclaim Pipeline and the Tailing Delivery Line performed <br />through September 2009. <br />Unless otherwise requested, and pursuant to Rule 7.3, a Quality Assurance /Quality Control package and /or <br />certification of construction will accompany an as -built submittal once facility construction has been completed. <br />Please contact me at (303) 569 -3221 ext. 1204 if you have any questions. <br />Sincerely, <br />7/ <br />Bryce Romig <br />Environmental Manager <br />Climax Mine and Mill <br />Cc: E. Bower, Climax <br />R. Valentine, Climax <br />R. Craft, Freeport- McMoRan <br />COLORADO OPERATIONS <br />Climax Mine <br />HWY 91— Fremont Pass <br />Climax, Colorado 80429 <br />Phone (719) 486 -2150 <br />Fax (719) 486 -2251 <br />