Laserfiche WebLink
SaYim - 2.05.3 <br />• <br />• <br />• <br />TABLE 2.05.3-T1 <br />MINE FACILITIES SUMMARY <br />Facilit Descri tion'~' Dimensions <br />Facilhies From Previous O orations <br />B-Seam Portal Sealed and beckfilled <br />B-Seam Ventilation Fan Demolished 1986 <br />Installation <br />C-Seam Main Portal Sealed and beckfilled <br />C-Seam Ventilation Fan Demolished 1986 <br />Installation <br />C-Seam Intake Portals Sealed, beckfilled, and reclaimed <br />C-Seam Mine Track Removed <br />Bear Creek Portal Access Removed and reclaimed <br />Road <br />Bear Creek Portal Sealed, beckfilled, and reclaimed <br />Bear Creek Ventilation Fan Removed and reclaimed <br />Installation <br />Bear Creek Substation Removed and reclaimed <br />400,000 Gallon Water Tank Removed and reclaimed <br />Lower Hubbard Creek Portal Sealed, beckfilled, and reclaimed <br />Lower Hubbard Creek Removed and reclaimed <br />Ventilation Fan Installation <br />Lower Hubbard Creek Hoist Includes access road, yard area, hoist, hoist <br />Facility equipment building, and bridge across Hubbard Creek <br /> - All facilities removed and reclaimed <br />Lower Hubbard Creek Coal Pre-Law disturbance <br />Refuse Pile <br />Lower Hubbard Creek Removed and reclaimed <br />Substation <br />Upper Hubbard Creek Access County road <br />Road <br />Upper Hubbard Creek Existing sedimentation pond 0.29 acre-feet <br />Sedimentation Pond <br />Upper Hubbard Creek Removed except for concrete foundation slab 20' x 20' <br />Substation <br />B-4, B-5, B-6, B-7, and B-8 Boreholes B-4 , B-5, B-7, and B-8 and degasification <br />Boreholes and Degasification facilities removed and reclaimed, Borehole B-6 has <br />Facilities been retained as a round water monitorin site <br />Elk C reek Cod Handlin , Su ort, and Ancille Fecllhles <br />East Yard Coal Stock ile O en coal stockpile -Included in eneral radio area 30,000 tons <br />Elk Creek Coal Stock ile O en coal stock ile 300,000 tons <br />Elk Creek Coal Stacking Two reinforced concrete stacking tubes on concrete 14' x 115' tubes, <br />Tubes foundations with pre-engineered steel headhouses, 300' conveyor <br /> transfer conve or and transfer chutes <br />Elk Creek Coal Reclaim Reinforced concrete box structure with reclaim 12' x 12' x 475' <br />System conveyor and associated feeders, conveyor drives, box, 650' <br /> and ventilation a ui ment conve or <br />Coal Screening Facility New pre-engineered steel building on concrete 35' x 35' x 55' <br /> foundation with screening equipment and transfer building <br /> chutes <br />Dump Station and Truck Reinforced concrete structure with concrete truck 40' x 140' <br />Scales ramp, steel surface frame and roof, 10'x 60'truck building <br /> scale, 125-ton and 400-ton steel bins, and feeders <br /> and conve ors <br />Crusher Feed Conveyor Steel frame conveyor with steel half-covers and steel 160' conveyor <br /> su ort structure on concrete pad footers <br />Crusher Bypass Conveyor New steel frame conveyor with steel half-covers and 200' conveyor <br /> steel su ort structure on concrete ad footers <br />Tipple Pre-engineered steel building on concrete foundation 30' x 50' x 50' <br /> with coal crusher, conveyor transfer chutes, and coal building <br /> sam lin s stem <br /> <br />PR04 2.05-9 Revised August 2000 <br />