• <br />• <br />~i <br />Topsoil <br />Prior to any surface facility related disturbances, topsoil will be <br />removed from the site to be disturbed as discussed in Section 4.06 <br />and stockpiled to satisfy the needs of reclamation. The topsoil <br />will be removed by bulldozers as described in Section 2.05.3, <br />Production Methods and Eguioment <br />No major subsurface disturbance is planned by the Bear Coal Company <br />during their facility relocation. However, approximately 15-inches <br />of topsoil will be removed from those areas to be affected by the <br />surface relocation. Several areas have been previously disturbed <br />by past underground mining activities; therefore, no topsoil is <br />available from those sites. An estimated 3600 cubic yards of <br />topsoil was removed and stockpiled in the locations shown on the <br />Mine Facilities Map (Map 10). Exhibit 23 contains the Sear No. 3 <br />Mine topsoil plan. <br />During August 1993 the sediment pond at the Bear No. 3 Mine was <br />enlarged. Approximately 0.2 acres was disturbed. The topsoil <br />salvaged from this area was placed on the topsoil pile shown on the <br />Mine Facilities Map (Map 10J. Approximately 430 cubic yards of <br />topsoil was salvaged which equates to an average depth of 15 <br />inches. <br />Overburden <br />No overburden is anticipated to be moved and stored as a result of <br />the Bear No. 3 Portals and surface relocation. Bear Coal Company <br />merely plans to clean up the existing face-up area of the old <br />Edwards Mine. Likewise, no surface blasting will be undertaken. <br />Coal Handling Structures <br />The detailed description of the coal handling and loadout facili- <br />ties for the Bear Coal Company operation is found under the Mine <br />Facilities section in 2.05.3. The location of these facilities is <br />shown on the Mine Facilities Map (Map 10). <br />Coal Processing Waste and Non-Coal Processing Waste <br />This part is not applicable. The Bear Coal Company uses a dry <br />crushing facility for coal preparation; no coal processing waste as <br />defined in <br />2.05-24R <br />Revised September 17, 1993 <br />