Laserfiche WebLink
C- 1981 -008 <br />TR -61 PAR No. 2 <br />2. Attachment 2.04.9 -10 <br />Oct. 31, 2011 <br />Page 2 of 3 <br />a) Attachment 2.04.9 -10 has been entitled, "2011 Stockpiled Soil Sampling Plan ". In order to <br />be consistent in the terminology used, please revise the title of this Attachment to read as <br />follows: "2011 Soil Sampling and Analysis Plan ", and revise the Table of Contents <br />accordingly. <br />b) Introductory text is provided on page 2 of this attachment. Please title this page, <br />"Introduction ". <br />c) Please consider revising the first paragraph to read as follows: "In a letter dated August 8, <br />2011, the Colorado Division of Reclamation, Mining and Safety (DRMS) required WFC to <br />develop a sampling and analysis plan for soil stockpiles and undisturbed soils on the <br />Morgan property. The following Sampling and Analysis Plan (SAP), has been developed <br />by Key Agricultural Services, Inc. (Key -Ag) and WFC, in consultation with the NRCS, <br />OSM, and DRMS, and is intended to satisfy the requirements of that letter. <br />d) Please consider revising the second paragraph of the Introduction to read as follows: "This <br />attachment contains the Sampling and Analysis Plan and a map of the proposed sampling <br />locations (Map 2.04.9 -3). Field data and analytical results will be incorporated at a later <br />date, when such results become available. <br />Attachment 2.04.9 -10 was revised as requested in each of the preceding four items. <br />Responses accepted. <br />e) Please provide details on the dimensions (footprint and height) and volume (CY) of each <br />stockpile to be sampled. <br />In the response, stockpile volumes and dimensions were incorporated into the Key Ag SAP <br />and onto Map 2.04.9 -3. Response accepted. <br />3. Key -Ag Sampling and Analysis Plan <br />a) On the cover page, the "s" is missing from "Fuels ". The spelling error has been fixed. <br />4. Map 2.04.9 -3 <br />a) Map 2.04.9 -3 has been entitled, "Morgan Property Soil Stockpile Sampling Plan ". In order <br />to be consistent in the terminology used, please revise the title of this Map to read as <br />follows: "2011 Soil Sampling Locations — Morgan Property ", and revise the Table of <br />Contents accordingly. <br />b) The symbol used to identify the proposed sample points is a large, light pink cross -hair. <br />The symbol is difficult to see. Please replace the symbol with something smaller, and use a <br />heavier line weight. <br />c) The stockpiles are identified with a small font. Please increase the font size, and use <br />stockpile terminology consistent with that shown on permit Map 2.05.4 -6 Morgan Property <br />Topsoil Replacement Plan. <br />d) The limits for which Bench 1 material has been proposed for use as Subsoil Substitute <br />should be identified on this map, consistent with those shown on Map 2.05.4 -6. <br />