My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-15_PERMIT FILE - C1981038
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2011-06-15_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:30 PM
Creation date
10/31/2011 2:14:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
6/15/2011
Doc Name
Reclamation Cost Estimate MR-127
Section_Exhibit Name
Reclamation Cost Estimate MR127
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Bowie No. 2 Mine <br />Pagel of 2 <br />BULLDOZER WORK <br />Regrade Three Drill Pads <br />Permit Action: Minor Revision 127 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 282 State: Colorado <br />Date: 13- Jun -11 County: Delta <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9R - 9SU (2005) <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />. Filename: C083 -282 <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $198.57 <br />MATERIAL QUANTITIES <br />Initial Volume: 7,300 <br />Swell factor: 1.165 <br />Loose volume: 8,505 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />125 feet <br />1,055.6 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />5% <br />7,500 feet <br />lbs/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$49.19 <br />NA <br />Operating Cost/Hour: <br />$110.89 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $198.57 <br />MATERIAL QUANTITIES <br />Initial Volume: 7,300 <br />Swell factor: 1.165 <br />Loose volume: 8,505 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />125 feet <br />1,055.6 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />5% <br />7,500 feet <br />lbs/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.