Laserfiche WebLink
Reveg Worksheet Cont'd Task # 287 Page 2 of 2 <br />4-1—Linn <br />Description <br />Cost /Acre <br />Crimping, with tractor (DMG survey data <br />$63.75 <br />Power mulcher (MEANS 32 91 13.16 0700) <br />$81.10 <br />Total Mulch Application Cost/Acre <br />$144.85 <br />NURSERY STOCK PLANTING: None required <br />JOB TIME AND COST <br />No. of Acres: <br />Estimated Failure Rate: <br />*Selected Replanting Work Items: <br />Initial Job Cost: <br />Reseeding Job Cost: <br />Total Job Cost: <br />Job Hours: <br />$1,911.01 <br />$570.35 <br />$2,481.36 <br />2.70 <br />1.35 <br />50% <br />SEEDING <br />Cost /Acre: $1,415.56 <br />Cost /Acre *: $844.97 <br />