My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-15_PERMIT FILE - C1981038
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2011-06-15_PERMIT FILE - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:30 PM
Creation date
10/31/2011 2:14:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
6/15/2011
Doc Name
Reclamation Cost Estimate MR-127
Section_Exhibit Name
Reclamation Cost Estimate MR127
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: Minor Revision 127 <br />Task #: 280 State: Colorado <br />Date: 13- Jun -11 County: Delta <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -280 <br />Task <br />Descri on <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />281 <br />282 <br />283 <br />284 <br />285 <br />286 <br />287 <br />Plug and Seal Three Exploration Boreholes <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />48.00 <br />$27,328.06 <br />$4,985.30 <br />$3,398.45 <br />$1,855.12 <br />$1,270.29 <br />$5,514.14 <br />$2,481.36 <br />Regrade Three Drill Pads <br />DOZER <br />25.11 <br />Regrade Light -Use Roads <br />DOZER <br />17.11 <br />Replace Topsoil from Stockpile to Three Drill Pads <br />DOZER <br />9.34 <br />Replace Topsoil from Stockpile to Light -Use <br />Roads <br />DOZER <br />6.40 <br />Reseed Three Drill Pads <br />REVEGE <br />6.00 <br />Reseed Light-Use Roads <br />REVEGE <br />2.70 <br />SUBTOTALS: <br />114.66 <br />$ $46,832.72 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02 <br />Total = <br />$946.02 <br />1.05 <br />Total = <br />$491.74 <br />57.33 <br />Total = <br />$3,357.24 <br />10.00 <br />Total = <br />$4,683.27 <br />TOTAL 0 & P = <br />$9,478.27 <br />CONTRACT AMOUNT (direct + O & P) = <br />$56,310.99 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />CONTINGENCY: <br />0.00 <br />4.25 <br />3.25 <br />Ha <br />Total = 0.00 <br />Total = $2,393.22 <br />$1,830.11 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $13,701.59 <br />TOTAL BOND AMOUNT (direct + indirect) = $60,534.31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.