Laserfiche WebLink
surface disturbance from pad and road construction. The State of Colorado will hold bond money <br />until the disturbed sites have been completely reclaimed and revegetated. Access to the <br />ro - reclaimed pad will be required for a revegetation study and annual photo documentation of the <br />regrowth. The revegetation study is typically a one time occurrence in order for the State of <br />Colorado to release the final portion of bonding. Annual access may be required until the State <br />determines regrowth is adequate. <br />8. When the drilling is complete the drill hole will be plugged per State of Colorado requirements, <br />the top 10' of casing will be removed, and the soil regraded to the approximate original contour. <br />Construction Schedule: BRL will limit the length of time from the commencement of the <br />construction of the drill pad to the completion of reclamation as much as possible. It is estimated <br />that the construction window will be four to six weeks but depends heavily on the drilling <br />contractor's availability and schedule. BRL can not be responsible for delays due to the drilling <br />contractor or adverse site and geologic conditions encountered. All drilling, construction, <br />reclamation, and other associated activities will be complete and all equipment will be <br />demobilized by August I" <br />IN WITNESS WHEREOF, the parties hereto have made and executed this Agreement as of the date <br />first written above. <br />Bowie Resources Ltd <br />ATTEST: • <br />By: Q `L � Date: � I to <br />Brad0y Hanson, <br />Vice President - General Manager <br />Turkey Track Ranch <br />ATTEST: <br />By: r/ ( Date: <br />Albert Donald, <br />Trustee <br />