Laserfiche WebLink
Task description: Replace topsoil over sloped areas <br />Site: South D -20 Pit <br />PROJECT IDENTIFICATION <br />Task #: 05A State: Colorado <br />Date: 10/25/2011 County: Montrose <br />User: GRM <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />Agency or organization name: DRMS <br />Basic Machine: Cat D9T - 9U <br />Horsepower: 405 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $251.56 <br />Total Fleet Cost/Hour: $251.56 <br />MATERIAL QUANTITIES <br />Initial Volume: 13,000 <br />Swell factor: 1.125 <br />Loose volume: 14,625 LCY <br />$72.40 <br />$140.68 <br />$0.00 <br />$38.49 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 150 feet <br />Unadjusted hourly production: 952.6 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 15 % <br />Average site altitude: 6,080 feet <br />Material weight: 2,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />BULLDOZER WORK <br />Permit Action: 2011 Reclamation <br />Liability Estimate Permit/Job #: M1992102 <br />0.750 <br />0.900 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB)) <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: M102 -05a <br />CIRCES Cost Estimating Software <br />