My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-26_ENFORCEMENT - M1992102
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1992102
>
2011-10-26_ENFORCEMENT - M1992102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 12:43:43 PM
Creation date
10/31/2011 8:36:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992102
IBM Index Class Name
ENFORCEMENT
Doc Date
10/26/2011
Doc Name
Reclamation Liability Estimate
From
DRMS
To
Western Gravel, Inc.
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: South D -20 Pit <br />PROJECT IDENTIFICATION <br />Task #: 03A <br />Date: 10/25/2011 <br />User: GRM <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Ripper Attachment: <br />Cost Breakdown: <br />Area: <br />BULLDOZER RIPPING WORK <br />Rip pit floor and roads <br />Permit Action: 2011 Reclamation <br />Liability Estimate Permit/Job #: M1992102 <br />County: Montrose <br />Agency or organization name: DRMS <br />Cat D9T - 9U <br />3 -Shank Ripper <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />State: Colorado <br />Total Fleet Cost/Hour: $266.52 <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 40 acres Rip Depth (ft): 2.00 Volume: 129,067 BCY or CCY <br />Source of estimated quantity: Entire permit floor less 7 acres sloped areas <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.838 Acres /hr <br />Site Altitude: 6,080 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />Unit cost: $383.383 Per acre <br />$80.19 <br />$140.68 <br />$7.17 <br />$38.49 <br />$266.52 <br />Selected estimating method: Area <br />Horsepower: 405 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />NA feet/second <br />2.63 mph <br />7.67 degrees <br />200.00 feet <br />88.00 feet <br />0.25 feet <br />0.838 acres /hour <br />0.70 Acres /hr <br />0.70 Acres /hr <br />Abbreviation: None <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 57.54 Hours <br />Total job cost: $15,335.00 <br />Filename: M102 -03a <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.