Laserfiche WebLink
Task description: <br />Site: South D -20 Pit <br />PROJECT IDENTIFICATION <br />Task #: 02A <br />Date: <br />User: <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $266.52 <br />Total Fleet Cost/Hour: $266.52 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />10/25/2011 <br />GRM <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 75 feet <br />Unadjusted hourly production: 1,600.0 LCY /hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Push out stockpiles of material <br />Cat D9T - 9U <br />405 <br />Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />50,000 <br />1.000 <br />50,000 LCY <br />0% <br />6,080 feet <br />$80.19 <br />$140.68 <br />$7.17 <br />$38.49 <br />Material weight: 2,850 lbs/LCY <br />State: Colorado <br />County: Montrose <br />DRMS <br />Weight description: Gravel - Dry (1 /4 " "- 2 " "diam.) <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />BULLDOZER WORK <br />Permit Action: 2011 Reclamation <br />Liability Estimate <br />0.750 <br />1.200 <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />Abbreviation: None <br />Page 1 of 2 <br />PermitlJob #: M1992102 <br />Filename M102 -02a <br />CIRCES Cost Estimating Software <br />