Laserfiche WebLink
Seg # v^ <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />700.00 <br />-5.00 <br />4.00 <br />-1.00 <br />2920 <br />0.31 <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />700.00 <br />5.00 <br />4.00 <br />9.00 <br />1348 <br />0.58 <br />Scraper Worksheet Cont'd Task # 06A <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Net Correction: <br />0.830 <br />NA <br />0.80 Minutes <br />0.60 Minutes <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Haul Time: <br />Return Time: <br />0.31 <br />0.58 <br />minutes <br />Unit cost: $0.416 /LCY Total job cost: $14,048.43 <br />Site Altitude: 6080 feet <br />minutes <br />Total Scraper team cycle time: 2.29 minutes <br />Adjusted for job conditions: 630.66 LCY/Hour <br />Selected Number of Scrapers: 1 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 630.66 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 630.66 LCY/Hour <br />Unadjusted unit production/hour: 759.83 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 53.52 Hours <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Scraper Worksheet Cont'd Task # 06A <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Net Correction: <br />0.830 <br />NA <br />0.80 Minutes <br />0.60 Minutes <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Haul Time: <br />Return Time: <br />0.31 <br />0.58 <br />minutes <br />Unit cost: $0.416 /LCY Total job cost: $14,048.43 <br />Site Altitude: 6080 feet <br />minutes <br />Total Scraper team cycle time: 2.29 minutes <br />Adjusted for job conditions: 630.66 LCY/Hour <br />Selected Number of Scrapers: 1 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 630.66 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 630.66 LCY/Hour <br />Unadjusted unit production/hour: 759.83 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 53.52 Hours <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />