Laserfiche WebLink
Task description: Replace 6" of topsoil over Pit 1 and Pit 5 <br />Site: Gunnison River Gravel Pits Permit Action: AR -01 <br />PROJECT IDENTIFICATION <br />Task #: 03A <br />Date: 10/19/2011 <br />User: THM <br />Cost Breakdown: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D7R DS Series II LGP <br />Horsepower: 238 <br />Blade Type: Straight <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$169.05 <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />MATERIAL QUANTITIES <br />Average push gradient: <br />Average site altitude: <br />$169.05 <br />9,680 <br />1.000 <br />9,680 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: Loose stockpile 1.2 <br />-5 % <br />4,670 feet <br />Material weight: 1,600 lbs/LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />State: Colorado <br />County: Mesa <br />$46.30 <br />$84.27 <br />$0.00 <br />$38.49 <br />200 feet <br />289.3 LCY /hr <br />BULLDOZER WORK <br />0.750 <br />1.200 <br />1.000 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Division of Reclamation, Mining & Safety <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Page 1 of 2 <br />Permit/Job #: M2009048 <br />Abbreviation: None <br />Filename: M048 -03a <br />CIRCES Cost Estimating Software <br />