Laserfiche WebLink
as <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />O la <br />02a <br />03a <br />04a <br />05a <br />06a <br />Re -grade Pit 1 and Pit 5 <br />DOZER <br />N <br />81.00 <br />$27,387.48 <br />$2,192.00 <br />$5,903.25 <br />$13,172.54 <br />$3,390.98 <br />$18,394.84 <br />Rip 7.9 acres of compacted area in Pit 1 <br />RIPPER <br />12.96 <br />Replace 6" of topsoil over Pit 1 and Pit 5 <br />DOZER <br />34.92 <br />Revegetation of 12 acres in Pit 1 and Pit 5 <br />REVEGE <br />16.00 <br />Mobilization <br />MOBILIZE <br />3.06 <br />Substitute Water Supply Cost <br />NA <br />1.00 <br />SUBTOTALS: <br />148.94 <br />$ $70,441.09 <br />Task description: Final Reclamation Cost Update AE <br />Site: Gunnison River Gravel Pits <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />001 • <br />10/19/2011 <br />THM <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />Permit Action: AR -01 <br />State: Colorado <br />County: Mesa <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />COST SUMMARY <br />DRMS <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />2.02 Total = <br />1.05 Total = <br />74.47 Total = <br />10.00 Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />500.00 <br />0.00 <br />5.00 <br />CONTINGENCY: 0.00 <br />Permit/Job #: M2009048 <br />Abbreviation: None <br />Filename: M048 -001 <br />Total = <br />Total = <br />$1,422.91 <br />$739.63 <br />$4,416.07 <br />$7,044.11 <br />$13,622.72 <br />$84,063.81 <br />500.00 <br />$0.00 <br />$4,203.19 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $18,325.91 <br />TOTAL BOND AMOUNT (direct + indirect) = $88,767.00 <br />