Laserfiche WebLink
Task description: <br />Site: Deakins Pit <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />MATERIAL QUANTITIES <br />Initial Volume: 15,057 <br />Swell factor: 1.000 <br />Loose volume: 15,057 LCY <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />Spread topsoil <br />PROJECT IDENTIFICATION <br />Task #: 05A State: Colorado Abbreviation: None <br />Date: 8/26/2011 County: Moffat Filename: M060 -05a <br />User: DMC <br />Agency or organization name' DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8R Series II - 8U (2005) <br />Horsepower: 310 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total unit Cost/Hour: $158.69 <br />Total Fleet Cost/Hour: $158.69 <br />$39.08 <br />$81.13 <br />$0.00 <br />$38.49 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 931.6 LCY /hr <br />Materials consistency description: Loose stockpile 1.2 <br />0% <br />6,200 feet <br />1,600 lbs/LCY <br />Top Soil <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 1.200 <br />Dozing method: 1.000 <br />BULLDOZER WORK <br />Permit Action: 2011 Midterm Review Permit/Job #: M2001060 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Page 1 of 2 <br />CIRCES Cost Estimating Software <br />