Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />O l a <br />02a <br />03a <br />04a <br />05a <br />Final grading <br />DOZER <br />, <br />I <br />8.65 <br />$1,372.19 <br />$1,473.00 <br />$1,332.53 <br />$3,759.69 <br />$1,782.69 <br />Rip compacted pit area <br />RIPPER <br />8.56 <br />Spread topsoil over disturbed area <br />DOZER <br />8.40 <br />Revegetate pit area <br />REVEGE <br />20.00 <br />Mobilize reclamation crew and equipment <br />MOBILIZE <br />2.68 <br />SUBTOTALS: <br />48.29 <br />$9,720.10 <br />Task description: Financial warranty adequacy review. <br />Site: Ross Pit <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 8/29/2011 County: Moffat <br />User: DMC <br />Agency or organization name' DRMS <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $196.35 <br />Performance bond: 1.05 Total = $102.06 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $972.01 <br />TOTAL 0 & P = $1,270.42 <br />CONTRACT AMOUNT (direct + 0 & P) = $10,990.52 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />COST SUMMA. <br />Permit Action: 2011 Midterm Review Permit/Job #: M1990134 <br />500.00 <br />0.00 <br />5.00 <br />Abbreviation: None <br />Filename: M 134 -000 <br />Total = <br />Total = <br />500.00 <br />$0.00 <br />$549.53 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $2,319.95 <br />TOTAL BOND AMOUNT (direct + indirect) = $12,040 <br />