2011-10-25_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-10-25_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
10/26/2011 11:12:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/25/2011
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Week of 10/09/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />17,326 <br />502,353 <br />Total <br />17,326 <br />502,353 <br />density testing, moisture verification, and depth check testing was performed with results <br />within project specifications. Test locations were surveyed by Ames. <br />D) High Volume Solution Collection System <br />1) High Volume Solution Collection Piping <br />Placement of the high volume collection system continued at the DCF placement area shown <br />on Figure 5A and Figure 5B, advancing in front of the placement. CPeP was placed and <br />sandbagged in accordance with design drawings and project specifications. <br />2) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) placement within the Phase 5 VLF continued. DCF was placed in the <br />areas shown on Figure 5A and Figure 5B. The DCF was hauled from the processing area to the <br />placement area using 40 -ton articulating haul trucks. The DCF was placed in a 2 -foot lift using <br />various CAT dozers except where haul routes were established. Haul route consisted of five - <br />foot lifts to be spread into 2 -foot lifts later. Laborers were present at all times during placement <br />holding the high volume collection piping in place, removing debris /sandbags, and assisting <br />the dozer operator with lift thickness. All DCF was placed on previously approved primary <br />geomembrane. AMEC field representatives monitored the DCF placement constantly. <br />E) Leak Detection Trench <br />1) VLF <br />No work performed during the week. <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. <br />amecs <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />Processing of Drain Cover Fill (DCF) continued at the DCF process area using a CAT dozer. <br />IV)VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF resumed performing deployment, seaming, <br />and repair /QC activities. Geomembrane installation was performed in the area shown on <br />Figure 3. Approximately 87,908 square feet of 80mil LLDPE was deployed using a Komatsu <br />200 excavator and a John Deere 544 front -end loader with spreader -bar attachments. Subgrade <br />was inspected and approved by AMEC and Lonestar representatives prior to geomembrane <br />VLF Weekly Report WE 10.15.2011 <br />