Laserfiche WebLink
ame <br />ATTACHMENT A <br />2011 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name <br />OCT 9 <br />OCT 10 <br />OCT 11 <br />OCT 12 <br />OCT 13 <br />OCT 14 <br />OCT 15 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />Craig Thompson <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />Uwe Kelley <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Robert Redd <br />- <br />GT <br />GT <br />GT <br />- <br />GT <br />- <br />Dustin Goto <br />- <br />- <br />GT <br />GT <br />GT <br />GT <br />GT <br />Eric Nargang <br />- <br />GT <br />GT <br />GT <br />- <br />GT <br />GT <br />Szu -Min Yang <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Ben Melly <br />- <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />Kevin Duarte <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Alyssa Wagner <br />- <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />Andy Ratz <br />- <br />LT* <br />LT* <br />LT* <br />- <br />LT <br />LT <br />Samantha Connor <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />Jay Moore <br />- <br />- <br />- <br />- <br />PS <br />- <br />- <br />*Night Shift <br />LEGEND <br />Engineer <br />VLF Weekly Report WE 10.15.2011 <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/Laboratory Manager <br />SE = Senior Engineer <br />