My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-17_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-10-17_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 2:21:22 PM
Creation date
10/26/2011 8:32:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
10/17/2011
Doc Name
TR-18 approval
From
DRMS
To
Rio Grande Silver, Inc.
Type & Sequence
TR18
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 10/17/2011 <br />User : RCO <br />Agency or organization name :DRMS <br />Permit or other job action :9400 portal, TR -18 <br />Task description : Grade and recontour portal, shaft and facilities areas <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Initial <br />volume : 9,000 <br />Source of estimated swell factor :na <br />HOURLY PRODUCTION <br />Source of estimated volume : 2.8 acres x 2 ft avg depth <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY /hr <br />Material consistency description : <br />Consolidated stockpile <br />CCY <br />State : Colorado <br />County :Mineral <br />Site : Bulldog Mine <br />Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Average push gradient : 5.00 % (neg) <br />Average site altitude : 9,400 feet <br />Material weight : 3,300 Ibs /LCY <br />Weight description : <br />Decomposed rock - 75% Rock, 25% Earth <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />1 Dozer(s) <br />$0.691 /LCY <br />Swell <br />factor : <br />Permit/job# :M- 1977 -215 <br />Abbreviation :none <br />Filename :M215 -005 <br />Basic machine : Cat D9R - 9SU (2005) Horsepower 405 <br />Blade type : Semi- Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Utilization % <br />$67.77 NA <br />$95.29 100 <br />$0.68 10 <br />$38.54 NA <br />$202.28 <br />Total job cost : $7,552 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $202.28 <br />Loose <br />1.215 volume : 10,935 LCY <br />Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shift/day) <br />Spoil pile : 0.70 (fnd -mf) <br />Push gradient : 1.11 (Cat HB) <br />Altitude : 0.95 (Cat HB) <br />Material weight : 0.70 (Cat HB) <br />Blade type : 1.00 (S /SU /U) <br />Net correction : 0.32 <br />Adjusted unit production : 292.91 LCY /hr <br />Adjusted fleet production : 292.91 LCY /hr <br />Total job time : 37.33 Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.