Laserfiche WebLink
STRUCTURE or ITEM DESCRIPTION <br />DIMENSIONS <br />DEMOLITION MENU SELECTION <br />QUANTITY <br />UNIT <br />UNIT COST <br />TOTAL COST <br />- Arched steel sets - remove <br />14x14x20 <br />Demo. /disp. /excay. pit - 50' push <br />1,960.00 <br />CF <br />$0.2257 <br />$442.42 <br />- Shop/lube - demo & backfill <br />40x70x20 <br />Demoidisp. /existing pit - 10K' haul <br />14,000.00 <br />CF <br />$0. 2230 <br />' $3,121.42 <br />-Shop/lube floor - demo & backfill <br />40x100 <br />Demoidisp. exs. pit, 6 "th. -10Kft. <br />4,000.00 <br />SF <br />$1.7083 <br />$6,833.16 <br />-Pump house (at dev rock pad) - demo <br />15x20x10 <br />Demo. /disp. /excay. pit - 50' push <br />1,000.00 <br />CF <br />$0. 2257 <br />$225.72 <br />-Liner (dev rock pad) - breach & bury <br />350x200 <br />Rip, fold edges, 2 ft cover in -place <br />1,100.00 <br />LF <br />$1.5000 <br />$1,650.00 <br />-Liner (fuel containment) breach & bury <br />30x50 <br />Rip, fold edges, 2 ft cover in -place <br />160.00 <br />LF <br />$1.5000 <br />$240.00 <br />-Water storage bldg - demo & dispose <br />40x40x15 <br />Demoidispiexcay. pit - 50' push <br />6,000.00 <br />CF <br />$0.2257 <br />$1,354.33 <br />- Compressor cover - demo & dispose <br />12x20x10 <br />Demo. /disp. /excay. pit - 50' push <br />300.00 <br />CF <br />$0.2257 <br />$67.72 <br />-Fence at vent raise - remove & dispose <br />280x7 <br />Fencing, chain link - to 6 ft. H <br />280.00 <br />LF <br />$2.0966 <br />$587.06 <br />-Vent fan - remove from site <br />5x5x5 <br />Load/5 mi. haul, slvg. - Steel fr. <br />5.00 <br />CY <br />$7.8700 <br />$39.35 <br />- Explosives storage unit - remove <br />8x8x16 <br />Load/5 mi. haul, slvg. - Steel fr. <br />38.00 <br />CY <br />$7.8700 <br />$299.06 <br />-Conex storage units <br />4© 8x8x20 ea <br />Load/5 mi. haul, slvg. - Steel fr. <br />190.00 <br />CY <br />$7.8700 <br />$1,495.30 <br />- Compressor, portable <br />8x6x12 <br />Load/5 mi. haul, slvg. - Steel fr. <br />21.00 <br />CY <br />$7.8700 <br />$165.27 <br />- Labeled fluids - remove & proper disposal <br />est. max 20 55 -gal drums <br />Liquid pickup - 55 gal. drums <br />20.00 <br />EA <br />$197.9468 <br />$3,958.94 <br />PROJECT IDENTIFICATION <br />UNIT COSTS <br />JOB COST <br />Agency or organization name :DRMS <br />Task # : 001 State :Colorado <br />Date : 17 -Oct -2011 County :Mineral <br />User : RCO Site Bulldog Mine <br />Permitting action :9400 portal, TR -18 <br />Task description : Remove structures, handle debris <br />Subtotal (unadjusted): <br />CIRCES Cost EstimatinuSoftware <br />DEMOLITION WORK <br />Last unit cost update : March 2009 <br />Permit/job# :M-1977-215 <br />Abbreviation : none <br />Filename :M215-001 <br />Location adjustment : 96.83% <br />$20,480 Total Cost (adjusted for location): <br />$19,831 <br />