Laserfiche WebLink
ADJUSTED COSTS <br />Depreciation <br />Ownership Costs <br />CFC <br />Overhead <br />Overhaul <br />Labor <br />Parts <br />Overhaul <br />Field <br />Labor <br />and Operating <br />Repair <br />Parts <br />Costs <br />Fuel <br />Lube <br />Tires <br />sheet 2 of 2 <br />G.E.C. <br />Acquisition cost : <br />$21.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Econ.life -Dozer and ROPS : <br />$21.02 <br />NA <br />NA <br />$8.99 <br />$21.14 <br />$10.52 <br />$20.59 <br />NA <br />NA <br />NA <br />NA <br />- Attachment no. 2 : <br />NA <br />NA <br />NA <br />$1.32 <br />$0.80 <br />$2.41 <br />$1.82 <br />NA <br />NA <br />NA <br />NA <br />Annual usage : <br />$31.72 <br />$16.94 <br />$19.11 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Double shifts : <br />$23.79 <br />$8.47 <br />$9.55 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Triple shifts : <br />$21.16 <br />$5.64 <br />$6.36 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Mechanic labor -Dozer and ROPS : <br />NA <br />NA <br />NA <br />$5.25 <br />NA <br />$6.14 <br />NA <br />NA <br />NA <br />NA <br />NA <br />- Attachment no. 2 : <br />NA <br />NA <br />NA <br />$0.77 <br />NA <br />$1.41 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Fuel /lube -Dozer and ROPS : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$31.57 <br />$7.62 <br />$0.00 <br />$2.98 <br />Attachment no. 2 : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.47 <br />$0.00 <br />$1.51 <br />ADJUSTED COST SUBTOTALS <br />Ownership Costs <br />Depreciation CFC Overhead <br />Overhaul <br />Labor I Parts <br />Overhaul and <br />Field Repair <br />Labor I Parts <br />Operating Costs <br />Fuel I <br />Lube <br />I <br />Tires <br />I G.E.C. <br />Dozer, ROPS and Attachment no. 2 : <br />Dozer : <br />Blade : <br />Attachment no. 1 : <br />Attachment no. 2 : <br />Dozer and ROPS : <br />405 <br />NA <br />53.4 <br />22.4 <br />9.6 <br />Single shifts : <br />$31.72 <br />$16.94 <br />$19.11 <br />$5.25 I $21.14 <br />I $6.14 $20.59 $31.57 <br />$7.62 <br />I <br />$0.00 <br />I $2.98 <br />Double shifts : <br />$23.79 <br />$8.47 <br />$9.55 <br />Attachment no. 2 : <br />NA <br />NA <br />NA <br />NA <br />NA <br />Triple shifts : <br />$21.16 <br />$5.64 <br />$6.36 <br />$0.77 $0.80 <br />$1.41 $1.82 $0.00 <br />$0.47 <br />2.6 <br />$0.00 <br />I $1.51 <br />EQUIPMENT PERFORMANCE DATA <br />Description <br />Horsepower <br />(FHP) <br />Transmission <br />Type <br />Weight <br />(UST) <br />Length <br />(ft) <br />Width <br />(ft) <br />Height <br />(ft) <br />Fuel <br />type <br />Ripper <br />type <br />Dozer : <br />Blade : <br />Attachment no. 1 : <br />Attachment no. 2 : <br />Cat D9R - 9SU (2005) <br />405 <br />NA <br />53.4 <br />22.4 <br />9.6 <br />13.1 <br />diesel <br />NA <br />Semi - Universal <br />NA <br />NA <br />7.2 <br />NA <br />14.2 <br />6.3 <br />NA <br />NA <br />ROPS Cab <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />3 -shank ripper <br />NA <br />NA <br />6.1 <br />3.9 <br />7.7 <br />2.6 <br />NA <br />Adj. Parallelogram <br />HOURLY OPERATOR WAGES <br />Base <br />Rate <br />Fringe <br />Benefits <br />F.I.C.A. <br />Unempl. <br />Wk.Comp. <br />Total <br />($ /hr) <br />Shift Differential <br />Colorado labor zone : <br />2 <br />7.65% <br />6.20% <br />10.00% <br />Dozer operator (< 70hp) <br />$23.67 <br />$9.22 <br />$1.81 <br />$1.47 <br />$2.37 <br />$38.54 <br />Day : <br />$0.00 <br />Two shift per day average : <br />$0.15 <br />Dozer operator ( > =70hp) <br />$23.67 <br />$9.22 <br />$1.81 <br />$1.47 <br />$2.37 <br />$38.54 <br />Swing : <br />$0.30 <br />Three shift per day average : <br />$0.25 <br />Mechanic <br />$16.74 <br />$4.20 <br />$1.28 <br />$1.04 <br />$1.67 <br />$24.93 <br />Night : <br />$0.45 <br />HOURLY EQUIPMENT COST SUMMARY <br />Ownership <br />Operating <br />Machine <br />and Overhaul <br />Attachments <br />Operator <br />Total <br />Cost/hr ($) <br />Single shifts : <br />$67.77 <br />$95.29 <br />$6.78 <br />$38.54 <br />$208.38 <br />Double shifts : <br />$41.82 <br />$95.29 <br />$6.78 <br />$38.69 <br />$182.57 <br />Triple shifts : <br />$33.16 <br />$95.29 <br />$6.78 <br />$38.79 <br />$174.02 <br />Total weight : 66.7 (UST) <br />