Laserfiche WebLink
Machine <br />Description <br />Total <br />Cost/hour /unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr /fleet <br />Return Trip <br />Cost/hr /fleet <br />- Generic 8 -10 cy, 6x4 <br />$9.27 <br />4 <br />$391.80 <br />$354.68 <br />Subtotals : <br />$391.80 <br />$354.68 <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : Non - <br />Roadable <br />Equipment <br />Haul time (hours) = 1.25 <br />Return time (hours) = 1.25 <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 3.50 <br />JOB TIME AND COST <br />Nearest major city or town within project area region : <br />Total one -way travel distance : <br />Average travel speed : <br />Roadable <br />Equipment <br />1.25 <br />1.25 <br />NA <br />NA <br />2.50 <br />Total non - roadable mob /demob cost * : <br />*two round trips with haul rig <br />Total roadable mob /demob cost ** : <br />** one round trip, no haul rig <br />Monte Vista <br />Total job cost : $3,689 <br />50.0 miles <br />40.0 mph <br />$2,756.38 <br />$933.10 <br />Total job time : 7.00 hours <br />