Laserfiche WebLink
Truck/loader team -Truck : <br />- Loader :CAT <br />Generic 8 -10 cy, 6x4 <br />938G high lift (2003) <br />Support equipment -Load area :NA <br />-Dump area :NA <br />Road maintenance -Motor grader :NA <br />-Water truck :NA <br />Cost Breakdown : <br />Truck/Loader <br />Truck <br />Work Team <br />Loading Tool <br />Support Equipment <br />Load Area <br />Dump Area <br />Road Maintenance <br />Motor Grader <br />Equipment <br />Water Truck <br />Import data filename : <br />truck2 <br />loader <br />NA <br />NA <br />NA <br />NA <br />% Utilization- machine : <br />100 <br />88 <br />NA <br />NA <br />NA <br />NA <br />- Ripper attachment : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour : <br />$9.27 <br />$18.70 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour : <br />$39.45 <br />$25.79 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour : <br />$22.29 <br />$38.54 <br />NA <br />NA <br />NA <br />NA <br />Unit subtotals : <br />Number of units : <br />$71.02 <br />$83.03 <br />NA <br />NA <br />NA <br />NA <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group subtotals : <br />Work : $225.07 <br />Support : $0.00 <br />Maintenance : $0.00 <br />PROJECT IDENTIFICATION <br />Agency or organization name :DRMS <br />Task # : 007 State :Colorado <br />Date : 10/17/2011 County :Mineral <br />User : RCO Site :Bulldog Mine <br />Permit or other job action :9400 portal, TR -18 <br />Task description :Carry topsoil to 9400 bench <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1,000 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : <br />Material weight : <br />Descr. : Earth - Dry packed <br />Rated payload : <br />Payload capacity : <br />Loading Tool Capacity : <br />Rated capacity (nom. heaped) : <br />Descr. :Other - moist loam <br />Bucket fill factor : <br />Adjusted bucket capacity : <br />CCY <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />Equipment Description <br />Swell <br />factor : <br />Abbreviation :none <br />Total work team cost/hour : $225.07 <br />Loose <br />1.125 volume : 1,125 LCY <br />Source of quantity take -off :Assume 25% of total topsoil to be replaced during reclamation <br />Source of estimated swell factor :na <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />Truck Bed (volume) Basis : <br />2,550 pounds /LCY Struck volume : <br />Heaped volume : <br />27,280 pounds Average volume : <br />10.70 LCY Adjusted volume *: <br />Final truck volume based on number of loader passes : <br />• truck volume adjusted to not exceed rated payload or heaped volume <br />Job Condition Corrections : <br />Altitude adj. : <br />Job efficiency : <br />Net correction <br />Truck <br />0.970 <br />0.830 <br />0.805 <br />Loader <br />1.000 <br />0.830 <br />0.830 <br />3.250 LCY <br />(100 -110 %) <br />1.050 <br />3.413 LCY <br />Permit/job # :M-1977-215 <br />Filename :M215 -007 <br />Shift basis : 1 per day <br />8.00 LCY <br />10.00 LCY <br />9.00 LCY <br />10.00 LCY <br />6.83 LCY <br />Site altitude (ft.) : <br />sheet 1 of 2 <br />9,400 <br />Source <br />(Cat HB) <br />(1 shift/day) <br />