Laserfiche WebLink
GENERAL SOLUTION MINING OPERATION <br /> WELLHEAD ABOVEGROUND PIPING FOR SURFACE PLANT <br /> ASSEMBLY LEACHING SOLUTIONS <br /> UINTA FORMATION <br /> APPROXIMATELY 2000'OF OVERBURDEN <br /> D O <br /> M <br /> m <br /> m <br /> DISSOLUTION SURFACE Z <br /> x <br /> m < <br /> M <br /> � z <br /> LOWER SALT ZONE D x T <br /> O <br /> 3 <br /> m 3 <br /> N 1 <br /> O A Z <br /> Z <br /> m <br /> CAVITY <br /> BEING <br /> LEACHED <br /> TYPICAL PILOT PLANT CAVITY-PILLAR ARRANGEMENT <br /> Proposed Layout for 3 AO' 3 ' <br /> Six Wells for <br /> 50,000 tpy Pilot Plant <br /> 350' <br /> AmerAlia,Inc. <br /> Figure D-3.2. <br /> General Solution Mining Operation and <br /> Typical Pilot Plant Cavity-Pillar Arrangement <br /> A049913d3 <br /> D-17 <br />