Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br /> H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br /> Task No. 1 Task Description Cost ($) <br /> --------------------------------- ------------ <br /> -------------`--'--I------------ <br /> Subtotal (H) : <br /> I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br /> Task No.1 Task Description Cost ($) <br /> ---------------------------- ----------- <br /> 18 Evaporate pond water $77,759 <br /> 19 Sample monitoring wells $12,000 <br /> 20 <br /> ------I------------ <br /> Subtotal (I) : $89,759 <br /> J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br /> Task No.1 Task Description Cost ($) <br /> I'-'--------- <br /> 13 Replace topsoil on evap. and storage pond areas $11,801 <br /> 14 Replace topsoil in process plant area $2,306 <br /> 15 Miscellaneous topsoil replacement, well field, $22,170 <br /> piping corridor, well field road, etc. <br /> Subtotal (J) : $36,277 <br />