My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-07-07_GENERAL DOCUMENTS - M1999051
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1999051
>
1999-07-07_GENERAL DOCUMENTS - M1999051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2021 7:08:32 AM
Creation date
10/24/2011 1:36:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999051
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/7/1999
Doc Name
Reclamation costs
From
DRMS
To
AmerAlia, Inc.
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE O� COLOR�I� <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 D I v I S 1 0 :. <br /> Phone:(303)866-3567 M IN E RA L S <br /> FAX:(303)832-8106 & <br /> GEOLOGY <br /> RECLAMATION <br /> MINING-SAFETY <br /> July 7D1999 <br /> Bill Owens <br /> r. Roger Day Governor <br /> Greg E.Walther <br /> AmerAlia, Inc. Executive Director <br /> P.O. Box 1330 Michael B.Long <br /> Rifle, CO 81650 Division Director <br /> R �oM-99-051 <br /> Rock School Lease Experimental Nahcolite Mine Project, <br /> Dear Mr. Day: <br /> Please find enclosed the preliminary reclamation cost estimate for the Rock School Lease Project. The cost <br /> estimate is the basis for the amount of bond that will be required for permit issuance. Certain components <br /> of the estimate will be updated once AmerAlia provides responses to the adequacy issues listed in the <br /> Division's letter dated June 18, 1999. For example, costs will be included for the disposal of pond liners <br /> and residues based on AmerAlia's responses. Costs for tree planting will also be included as appropriate. <br /> One of the most significant reclamation costs included in the estimate is for demolition of surface structures. <br /> Unit costs for building demolition are based on building'volume, and the Division's estimate is based on <br /> assumed heights for the buildings. If AmerAlia provides the actual heights proposed for each building, the <br /> cost estimate may be refined. <br /> If you have any questions,please contact me. <br /> SincErely, <br /> j.. <br /> Allen C. Sorenson <br /> Reclamation Specialist <br /> enclosure(s) <br /> cc: Jack Clark (W enclosures) <br /> c:\windows\personal\ameralia three.doc <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.