My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-08-23_HYDROLOGY - M1999051
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999051
>
1999-08-23_HYDROLOGY - M1999051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2021 5:08:43 AM
Creation date
10/24/2011 1:27:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999051
IBM Index Class Name
HYDROLOGY
Doc Date
8/23/1999
Doc Name
Surface & Ground Water Monitoring Plan
From
TRC Hydro-Geo Consultants
To
DRMS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2.0 PROJECT DESCRIPTION <br />1 • • <br />MEMORANDUM <br />TO: Roger Day and Jack Clark, AmerAlia, Inc. DATE: August 19, 1999 <br />FROM: Scott Miller and Bill Thompson OUR REF.: 993 -2057 <br />Golder Associates Inc. <br />RE: ROCK SCHOOL LEASE EXPERIMENTAL NAHCOLITE MINE - <br />QUALITATIVE RISK ASSESSMENT <br />1.0 INTRODUCTION <br />This memorandum presents the approach, methods, and results of a qualitative risk <br />assessment developed to evaluate the potential environmental risks to soils, surface and <br />groundwater, and wildlife associated with the proposed Rock School Lease Experimental <br />Nahcolite Mine. The objective of this assessment is to review the proposed mine plan and <br />evaluate the adequacy for environmental protection. In areas where potential risks are <br />identified additional mitigation is proposed. <br />The Rock School Lease Experimental Nahcolite Mine is located in Rio Blanco County, <br />Colorado. The experimental mine will consist of the following: <br />• Pilot -scale processing plant <br />• Limited to six solution mining wells and 5 year operation <br />• Surface pipeline from well field to plant <br />• Drainage pond <br />• 3 -acre evaporation pond <br />• 7 -acre evaporation pond <br />• Fresh water pond <br />• Water supply well <br />• Process monitoring well <br />• Compliance monitoring well <br />\ \GA1_DEN1\ PROJECTS \WP\99\2057\2057TM1.DOC Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.