Laserfiche WebLink
• • <br />It was advised that production volumes may not be as important as solution volumes contained in <br />solution trains. <br />Operator was advised to provide detection limits with the White River process solution analysis. <br />It was indicated that all the supporting documentation presented in today's discussion would be <br />provided in the adequacy response. <br />The Operator's proposal apparently will be presented again to you on July 23 during the pre -op <br />inspection. Apparently the proposal will be to utilize one of the proposed 6 wells as a monitoring <br />well with four monitoring points, and to utilize an existing BLM well immediately down gradient as <br />a compliance well. The compliance well would monitor only the combined waters between the <br />Uinta and the A- Groove. <br />The operator was cautioned that approvals derive from the Division, that my role is advisory to <br />the lead specialist, and that all materials and discussions should go through the lead. <br />Presumably, the gist of today's discussion will be presented again during the pre -op. <br />cc (e -mail) JAP <br />