Laserfiche WebLink
Introduction <br />This document is the decision package prepared by the Colorado Division of Reclamation, <br />Mining and Safety (Division) for the West Elk Mine, Permit Renewal No. 6 (RN -06). This <br />document includes: 1) the proposed decision to approve the permit renewal application; <br />2) a summary which includes a history of the review of the permit renewal application, a <br />description of the environment affected by the operation and a description of the mining and <br />reclamation plan; and 3) the written findings of compliance the Division have made as required <br />by the Colorado Surface Coal Mining Reclamation Act. Detailed information concerning the <br />findings of compliance can be found in the Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining. <br />The Division has received an application for a permit renewal to conduct surface coal mining and <br />reclamation operations at the West Elk Mine. The application was submitted by Mountain Coal <br />Company (MCC), the operator of the West Elk Mine. This document is updated upon permit <br />renewal, which occurs every five years for the West Elk Mine. The findings in this document <br />were re- evaluated and updated as necessary to reflect changes which have occurred during the <br />past permit term. <br />The mine permit area encompasses approximately 17,155 acres on federal and private lands <br />within Gunnison and Delta Counties, Colorado. These lands include all or portions of: Sections <br />9 through 36, Township 13 South, Range 90 West of the 6 P.M., Sections 23 through 26, <br />Township 13 South, Range 91 West of the 6 P.M, and Sections 1, 2, 3, 4, 8, 9, 10, 11, and 12 <br />Township 14 South, Range 90 West of the 6 P.M. The lands within the permit area can be <br />found on the USGS 7.5 minute Quadrangle maps of Bowie and Somerset. <br />Proposed Decision <br />The Colorado Division of Reclamation, Mining and Safety proposes to approve the application <br />for Permit Renewal 6, with stipulations. This decision is based on a finding that the operations <br />will comply with all requirements of the Colorado State Program as found in the Colorado <br />Surface Coal Mining Reclamation Act, C.R.S. 34 -33 -101 et seq., and the Regulations <br />promulgated pursuant to the Act. If no request for a formal hearing is made within thirty (30) <br />days of the first publication of the issuance of this proposed decision, then this decision becomes <br />final. Upon submittal of acceptable surety by MCC, the permit will be issued. The permit <br />application, all supporting documentation and any stipulations or conditions will become a <br />binding part of the permit. <br />Permit C -80 -007 has four active permit stipulations that are listed below. Inactive permit <br />stipulations are listed in Appendix "A" at the end of this Findings Document. <br />2 <br />