Laserfiche WebLink
MINE ENGINEERING <br />MINE RECLAMATION <br />October 19, 2011 <br />Dan Hernandez <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: New Elk Mine Permit C- 1981 -012 <br />Technical Revision Application No. 60 <br />Development Waste Disposal Area Expansion <br />Supplemental Data <br />Dear Mr. Hernandez: <br />On behalf of New Elk Coal Company, (NECC) enclosed are some supplemental data for the <br />technical revision to expand the development waste disposal area. <br />NECC decided it would be prudent for it to increase the length of the haul road that is located <br />north of the DWDA to provide flexibility in hauling material to the pile. The haul road will <br />extend to a point slightly east of the RDA conveyor. This road segment was previously classified <br />as an access road. This haul road extension will also facilitate NECC's plan to move the RDA <br />conveyor loading point from the south side of the river to the north side of the river. <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Ron Thompson, NECC <br />Mike Trujillo, CDOW <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7 STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />pC? 21`1`11 <br />; amat\on , <br />f etiy <br />Mining and Sa <br />Attachments: (3) TR -60 Transmittal letter dated October 19, 2011 <br />TR -60 Map 11 Sheet 1, revised October 19, 2011 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />