Laserfiche WebLink
am& <br />ATTACHMENT A <br />2011 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name <br />OCT 2 <br />OCT 3 <br />OCT 4 <br />OCT 5 <br />OCT 6 <br />OCT 7 <br />OCT 8 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />- <br />Craig Thompson <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />- <br />Uwe Kelley <br />- <br />- <br />ST <br />ST <br />ST <br />ST <br />- <br />Robert Redd <br />- <br />GT <br />GT <br />GT <br />GT <br />GT <br />- <br />Dustin Goto <br />- <br />GT <br />GT <br />GT <br />GT <br />GT <br />- <br />Eric Nargang <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Szu-Min Yang <br />- <br />ST <br />ST <br />ST <br />- <br />- <br />- <br />Ben Melly <br />- <br />LG <br />LG <br />LG <br />LG <br />LG <br />- <br />Kevin Duarte <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />Alyssa Wagner <br />- <br />GT <br />GT <br />GT <br />GT <br />GT <br />- <br />Andy Ratz <br />- <br />LT <br />LT <br />LT <br />LT <br />LT <br />- <br />Samantha Connor <br />- <br />- <br />- <br />- <br />ST <br />ST <br />- <br />Jay Moore <br />- <br />- <br />- <br />- <br />PS <br />- <br />- <br />*Night Shift <br />LEGEND <br />VLF Weekly Report WE 10.08.2011 <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/Laboratory Manager <br />SE = Senior Engineer <br />