Weekly Construction Quality Assurance ("CQA") Report: Week of 10/02/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed the excavation and backfill of anchor trenches within the Phase 5 VLF. <br />AMEC inspected and approved 80mil primary geomembrane within the Phase 5 VLF. <br />AMEC observed the installation of the high volume solution collection system within the Phase 5 VLF. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC observed the DCF placement within the Phase 5 VLF. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture- Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue subgrade acceptance prior to SLF placement within the Phase 5 VLF. <br />Continue slope contouring and subgrade preparation within the Phase 5 VLF. <br />Continue SLF placement within the Phase 5 VLF <br />Continue subgrade acceptance prior to geomembrane deployment within Phase 5 VLF. <br />Continue geomembrane installation within Phase 5 VLF. <br />Continue obtaining samples and assisting in the process of DCF material at the DCF Process area. <br />Continue excavation and backfill of the existing anchor trench within the Phase 5 VLF. <br />Continue geomembrane exposure within the Phase 5 VLF. <br />Continue installation of the high volume solution collection system within the Phase 5 VLF. <br />Continue DCF placement within the Phase 5 VLF. <br />Continue leak detection system installation within the Phase 5 VLF. <br />Continue 80mil primary geomembrane acceptance within the Phase 5 VLF. <br />Summary of Non - conformances: <br />None Issued <br />amecs <br />Summary of Meetings and Discussions: <br />CC&V: <br />CC &V held a weekly construction meeting on October 4, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />VLF Weekly Report WE 10.08.2011 <br />