My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-20_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-10-20_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
10/21/2011 10:54:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/20/2011
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Week of 10/02/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />- <br />D = Day Shift N = Night Shift <br />St <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: October 8, 2011 <br />Reporting Period: 10/2/11 through 10/8/11 <br />Ambient Temperature Range (F): Low: 22 °F to 43 °F ( + / -) High: 31 °F to 63 °F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES/Lonestar: No work was performed on Saturday, October 8, 2011 due to snow and saturated work <br />surfaces. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />amec <br />I) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />Subgrade acceptance was not performed during the week. Previous subgrade acceptance is <br />shown on Figure 1. <br />B) Slope Contouring <br />1) VLF <br />No work performed during the week. <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />C) Soil Liner Fill <br />1) VLF <br />Soil liner fill (SLF) placement continued in the areas shown on Figure 2. Subgrade was <br />approved and moisture conditioned prior to placement using a tandem -axle water truck. <br />Placement was performed using various CAT dozers and one skid steer loader in a one -foot <br />compacted lift. SLF material was hauled to the placement area from the S. Cresson clay <br />stockpile using 40 -ton articulating haul trucks loaded by a John Deere 744 front -end loader. <br />Moisture conditioning of SLF material was performed in place using a tandem -axle water truck <br />and compaction was achieved using a 10 -ton vibratory smooth drum compactor. Nuclear <br />VLF Weekly Report WE 10.08.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.