Laserfiche WebLink
LARRY E. O'BRIAN :.• <br />-FOUNDER <br />STEVAN t.O'BRIAN <br />PRESIDENT <br />1VIr Peter S. Hays <br />Division:of Reclamation, Minmg &. S afety <br />1313 Sherman -St, # 215 <br />Denver, Cv 802 <br />7985. VANCE, DRIVE; SUITE,205A <br />ARVADA, COLORADO 80003 ' <br />303 423 7297 <br />FAX 423 -7599 <br />ear Peter, <br />E: Grand County Department Of Road an Budge,;' <br />a- -lYiert Fill: Notices M- 1977;154; G yAirport Pit,1VI 1978; 143, Kremmlmg Airport Pit <br />M 995 :004, Inspiration Point, , MVI- 008A08 Red Dirt Pit,,M -2009 N/12009-0641' #3 Pit,. & M-. <br />2010 072, Grand County Reclamation Project <br />n behalfof rriy client Grand County Department of Road acid Bridge I will respond:to, <br />fro you` after we discussed -the letter on the phone <br />In. general your letter says that Grand County must file a Technical` Revision for eac <br />mine listed, as the filing of the Inert Notice constituted a revision t'o the Reclamation for <br />each mine I disc ee : that filin Inert FillNotices re uire a Technical Revision Rule 3 1 5 9 <br />requires an operator to file said notice with the:Division if they " x intend' to <br />backfill i;riert structural fill 'generated: out side the approved , <br />p ermit : area, ": and it gives the Division` (office) 30 day to respond and says the <br />operator can proceed;if no response is receive <br />n this case the Notices were filed on 8/11 /2011 the Divisions written response; was sen <br />on 9 /23/1'1 (received 9 /28/11) for atotal of 43 days :This exceeds the 30 'day limit and I feel' this <br />is no different then,any other°regul,atory time limit placed on'the Division or operator in the Rules <br />and Law., ialsO:p6ifit out thdf the reclamation plans were not changed since the ; imported inert <br />material would be:,used so supplement on site'materiaLfor slope reconstruction and growth: <br />